建设中

你的这次采样正好赶上我们施工。

这些指南面向新版 ExpiWell 平台(v2),仍在撰写、校对和调整中——请谅解眼前的脚手架:页面可能在两次访问之间移动或更改。仍在使用旧版应用?其文档仍保留在旧的支持门户上。

打开旧版支持门户
知识库  /  来自 ExpiWell 团队

我们能你什么?

覆盖研究每一步的指南——从第一个项目到最终的数据导出。ExpiWell 知识库,服务于研究者网页平台与参与者移动应用。

28 个类别下共 97 篇指南 · 由 ExpiWell 团队维护更新
Help CenterBuildSurvey Creation

Scheduled group

Build · Survey Creation
Updated 2026年7月20日

This feature allows a randomized or manual selection process to determine which group or cluster of questions to present to participants based on their scheduled survey sessions. This randomization adds an element of unpredictability, ensuring each participant receives a varied and unbiased selection of questions over time. For instance, consider a survey with four question groups labeled Group A, Group B, Group C, and Group D. Here's an example schedule for two participants:

Participant 1

Day 1 - Group B

Day 2 - Group A

Day 3 - Group D

Day 4 - Group C

Participant 2

Day 1 - Group D

Day 2 - Group A

Day 3 - Group B

Day 4 - Group C

Setting up

To set this up, navigate to the survey builder and click 'Add Scheduled Group', as shown in the image below. Then, create as many groups as needed.

The survey builder showing a Schedule Group with Group Options (Randomize All, Random Select, Loop) and an Advanced Options Logic panel

On the scheduling page, you'll have the option to either randomize the groups or manually select them for presentation to participants.

Screenshot — Scheduling page - Scheduled group option

You can choose to randomize the groups and specify how many groups participants will receive at each prompt, along with options for with or without replacement.

Screenshot — Random Choice option

Here are some examples for scenarios using the "Random Choice":

  1. Schedule the survey 4 times with replacement (Randomly Choose = 1 out of 4): A, B, A, C

  2. Schedule the survey 4 times without replacement (Randomly Choose = 1 out of 4): A, C, D, B

  3. Schedule the survey 4 times with replacement (Randomly Choose = 2 out of 4): AC, DB, BC, AD

  4. Schedule the survey 4 times without replacement (Randomly Choose = 2 out of 4): - (not applicable)

  5. Schedule the survey 2 times without replacement (Randomly Choose = 2 out of 4): AC, BD

These examples illustrate different scenarios of using the "Randomly Choose" option in survey scheduling, considering both with and without replacement choices.

Manual Choice

FAQs

What is with or without replacement?

  1. With Replacement: Survey groups are randomly selected from an available pool and then returned, allowing the same group to be chosen multiple times. This keeps the probability of selecting each group constant throughout the process.

  2. Without Replacement: Survey groups are randomly selected from an available pool but are not returned, ensuring that each group is chosen only once. This changes the probability of selecting each group with each draw as the pool decreases after each selection.

For further inquiries, please reach out to help@expiwell.com

Video demo — Scheduled Group (coming soon)
Was this helpful?
Start today

与 ExpiWell 团队的真人交流。

还没解决?我们的研究者团队既解答技术问题,也解答研究设计问题。